Wayside Middle School
Fort Worth, TX
Pogue Construction
For this current project, we mobilized to excavate for a new Northwest ISD school after an existing school was demolished. The excavation scope for the new school requires around 50,000cy of moisture conditioned soil capped with over 7,000cy of select fill and 15,000 tons of recycled flex base. The project will also require nearly 50,000cy of imported soil to bring the site to grade.
Services
Excavation
Lime Stabilization