Projects
8111 Douglas
Excavation for an approximately 25’ deep, 130,000sf underground parking garage with an office building overtop of it.
Learn More
American Airlines DFW Central Fulfillment Center
Demolition of over 100,000sf of existing pavement and excavation for a new 400,000sf structure and 400,000sf of new paving. Approximately 150,000cy of moisture conditioning, 30,000cy of imported select fill and 15,000 tons of recycled flex base.
Learn More
DSV Warehouse
This project had over 10,000cy of haul off, nearly 200,000cy of moisture conditioned soil and over 40,000 tons of recycled flex base.
Learn More
Epic Central
Fort Worth Logistics Hub
HEB Alliance
Over a ten acre site, this project included approximately 30,000cy of excavation, 50,000cy of moisture conditioned soil, 25,000cy of imported select fill, 10,000 tons of recycled flex base and 10,000cy of common fill as well as over 30,000sy of lime stabilization.
Learn More
Holford Recreation & Aquatic Center
This site located at Holford Park in Garland added multiple new pools, building and sport courts.
Learn More
International Leadership School of Texas
we provided over 11’ of select fill beneath the new 115,000sf building, 50,000cy of excavation and 10,000cy of haul off as well as lime stabilization for the new pavement subgrade.
Learn More
Iron Ranch Business Park
There were four different slabs to prep with 8’ of moisture conditioned soils capped with 3.5’ of select fill and 6” of recycled flex base for this project.
Learn More
JPS Parking Garage
This current project, located on the John Peter Smith Hospital campus, required demolition of approximately 20,000sf of existing pavement followed by excavation for a new parking garage.
Learn More
Lewisville 121 Business Park
This current project located on a heavily treed site is being cleared to provide excavation for nearly 1.2 million square feet of new warehouse space across three buildings and over 1,000,000sf of new paving.
Learn More
Lupe Garcia Elementary School
Excavation for a new Elementary School in Rockwall ISD. This project included excavation for a structural slab over carton forms and crawl space, moisture conditioning and recycled flex base for the subgrade at the playgrounds and flatwork and rip rap installation at the detention pond.
Learn More
Northwest ISD Middle School #8
This new middle school in a rapidly developing area is receiving varying depths of moisture conditioned soil capped with select fill and recycled flex base.
Learn More
Prairie View Elementary School
For this current project, we are excavating and grading for a new school in Northwest ISD behind the existing elementary school.
Learn More
Rockwall Middle School #4
The new 140,000sf school building was excavated for a structural slab over carton forms and a crawl space.
Learn More
SPR Distribution Center
This 160,000sf warehouse required 9’ of moisture conditioned soils capped with 2’ of recycled flex base.
Learn More
Spiritas Ranch Elementary School
This new 90,000sf school building subgrade was chemically injected and then capped with over 6,000 tons of recycled flex base.
Learn More
The Quadrangle
Located in the heart of Uptown, we excavated approximately 50’ deep over an 80,000sf footprint for a new parking garage topped with residential and retail.
Learn More
Ursuline Academy East Campus Building
Wayside Middle School
For this current project, we mobilized to excavate for a new Northwest ISD school after an existing school was demolished.
Learn More
Projects
Lewisville 121 Business Park
Bratjen Construction Company
Lewisville, TX
Northwest ISD Middle School #8
Northstar Builders Group
Northlake, TX
Wayside Middle School
Pogue Construction
Fort Worth, TX
JPS Parking Garage
Beck Group
Fort Worth, TX
Prairie View Elementary School
Hill & Wilkinson General Contractors
Rhome, TX
Iron Ranch Business Park
EMJ Construction
Fate, TX
Rockwall Middle School #4
Northstar Builders Group
Fate, TX
Holford Recreation & Aquatic Center
Hill & Wilkinson General Contractors
Garland, TX